Sunday, May 28, 2017

Still things to do but getting close.

Still need to install the window molding tile, the sink, towel bars, door frame and stuff but almost done.





old!


New!

I still have a little bit more tile trim work to do around the window






towel bar needs to be installed and I have to make a new vent cover



I need to install a new door and trim



Saturday, May 27, 2017

Wall tile installed. Time for grout!

It took me about 3 days, 12 hours for 2 days and 10 hours for the 3rd. This is almost straight through with little break! Going to grout, finish the plumbing and install the toilet next. We are still trying to figure out the exact sink so that might take a little longer.





Monday, May 22, 2017

Walls up!

tiling the floor next!













We plan on getting wood patterned flooring designed in a herring bone pattern. I'm excited to see this finally coming together! A lot of the work happened behind the walls but once the boards went up, it started to look like a bathroom. I didn't take a picture of the vapor barrier installation but all of that stuff is done too.